From Haul Road to Essential Feature of the Future Aquatic Ecosystem
This week our contracting team worked to permanently stabilize the haul road on the floor of Lake Williams. During construction this haul road served as the main throughfare for the team to cross the floor of Lake Williams time and time again. This stabilization work will soon provide an ideal location for the reproduction and breeding of many aquatic animals that are essential to a healthy and balanced aquatic ecosystem.