Spillway Updates
![Construction of the Lake Williams Dam for York Water Company.](https://www.yorkwater.com/wp-content/uploads/September-19-2023.jpg)
The top of the spillway’s mass concrete section is being poured. The final section of the spillway’s engineered weir will soon be formed up.
The top of the spillway’s mass concrete section is being poured. The final section of the spillway’s engineered weir will soon be formed up.