Labyrinth Weir Structures
The new labyrinth weir structures are being constructed on the top of the spillway and the new power conduits that will supply all power to the site from the grid.
The new labyrinth weir structures are being constructed on the top of the spillway and the new power conduits that will supply all power to the site from the grid.