Spillway Work
![Dam construction for York Water.](https://www.yorkwater.com/wp-content/uploads/July-24-2023.png)
Topsoil is being placed above the Spillway’s Left RCC Embankment wall. In the background, the labyrinth weir walls are being formed and poured with self-consolidating concrete. The dam’s new pre-cast control building has been set in place on the right embankment.