![Construction workers pouring cement at the Lake Williams Dam.](https://www.yorkwater.com/wp-content/uploads/May-3-2023.jpg)
Greg Goodling, a Kinsley Foreman, is using a GPS Rover to check the elevation of the drain fill base material being transported via telebelt. The work is taking place on the left embankment area of the spillway.