Valve Tower Work
![48 inch pipe waiting to be installed at the Lake Williams Dam.](https://www.yorkwater.com/wp-content/uploads/April-24-2023.jpg)
The last section of 48-inch of pipe has been installed just upstream of the valve tower. Rebar and formwork are being installed in advance of pouring the encasement concrete.
The last section of 48-inch of pipe has been installed just upstream of the valve tower. Rebar and formwork are being installed in advance of pouring the encasement concrete.