Drilling into the Metamorphic Bedrock
![Rotary drilling at the Lake Williams Dam.](https://www.yorkwater.com/wp-content/uploads/January-25-2023.jpg)
Rotary drilling has commenced through the plinth’s preformed grout holes and into the metamorphic bedrock underlying the site. Simultaneously, temporary diversion structural walls are being formed up in the spillway.