Valve Tower’s Top Deck Formwork
A new blend of Roller Compacted Concrete (RCC) is being placed on the new spillway right training wall. Simultaneously, in the background on the right, inclined anchors are being drilled into bedrock for the non-overflow wall section. On the left side of the photo, another crew is working on the valve tower’s top deck formwork.