Preparation for the New Core Wall
![The old dam wall](https://www.yorkwater.com/wp-content/uploads/November-8-2022.jpg)
The original 1911 concrete core wall that was cut with a diamond tipped cable saw has been prepared with an imbedded flexible “water stop” component in preparation for connection into a new section of core wall to be installed.