Formwork for the Valve Tower
![Framework of the valve tower](https://www.yorkwater.com/wp-content/uploads/October-18-2022.jpg)
Formwork for the valve tower’s cantilevered deck and preparation of the intake structure’s screens is taking place.
Formwork for the valve tower’s cantilevered deck and preparation of the intake structure’s screens is taking place.