Excavation Continues
Work continues on the valve tower. The dam’s original 1911 core wall has been exposed for future connection to the new dam structure. Excavation of the left downstream area continues.
Work continues on the valve tower. The dam’s original 1911 core wall has been exposed for future connection to the new dam structure. Excavation of the left downstream area continues.