Diverting Excess Stream Flow
![A large, temporary cofferdam to divert excess stream flow is being built around the construction site. A “soil nail wall” to stabilize a sizable excavation on the left side of the dam was just installed, and dewatering wells that will be used to control groundwater levels during construction are being drilled.](https://www.yorkwater.com/wp-content/uploads/June-29-2022.jpg)
![A large, temporary cofferdam to divert excess stream flow is being built around the construction site. A “soil nail wall” to stabilize a sizable excavation on the left side of the dam was just installed, and dewatering wells that will be used to control groundwater levels during construction are being drilled.](https://www.yorkwater.com/wp-content/uploads/June-29-2022-2.jpg)
A large, temporary cofferdam to divert excess stream flow is being built around the construction site. A “soil nail wall” to stabilize a sizable excavation on the left side of the dam was just installed, and dewatering wells that will be used to control groundwater levels during construction are being drilled.