Valve Tower’s Second Lift
The new Lake Williams Dam valve tower’s second lift has been poured and the 48” diameter ductile iron outlet pipe is now visible behind the cofferdam.
The new Lake Williams Dam valve tower’s second lift has been poured and the 48” diameter ductile iron outlet pipe is now visible behind the cofferdam.